STEVENS CENTER
Basic . Facilities . Manual
Production Manager & Technical Directors Phone: (336) 721 - 0712


LINE SCHEDULE


LINE # DISTANCE SCENERY NOTES
Truss 11' - 0" Apron truss 38’-0" wide Flat truss with circuits
Pipe 4' - 0" Apron truss 38’-0" wide Pipe with circuits
Plaster Line 0' - 0" PLASTER LINE
* 0' - 3" Asbestos Curtain
* 1' - 3" House Curtain
1 2' - 1" Black Border Removable
2 2' - 7 1/2" Black Legs Removable
3 3' - 3" Open
1st Electric 4' - 0" Electric Electric winch
Shell 4' - 6" Orchestra Ceiling Hand Line
4 6' - 0" Open *See note below for line #4
5 6' -7" Open
6 7' - 1" Open
7 7' - 6" Open
8 8' - 1" Open
9 8' - 6" Black Border Removable
10 9' - 0" Black Legs Removable
11 9' - 4" Open
12 10' - 0" Open
13 10' - 5" Open
2nd Electric 11' - 9 1/2" Electric Electric winch
Shell 12' - 9" Orchestra Ceiling Hand Line
14 13' - 6" Open
15 14' - 0" Open
16 14' - 6" Open
17 14' - 11" Open
18 15' - 6" Open
19 16' - 0" Open
20 16' - 6" Open
21 17' - 0" Black Border Removable
22 17' - 11" Black Legs Removable
23 18' - 6" Open
24 19' - 0" Open
3rd Electric 19' - 6" Electric Electric winch
Shell 20' - 6" Orchestra Ceiling Hand Line
25 21' - 6" Open
26 21' - 11" Blackout Drop Removable
27 22' - 5" Open
28 23' - 0" Open
29 23' - 6" Open
30 24' - 6" Open
31 25' - 0" Black Border Removable
32 25' - 6" Black Legs Removable
Shell 26' - 6" Electric Hand Line
4th Electric 27' - 6" Orchestra Ceiling Electric winch
33 28' - 6" Open
34 29' - 0" Open
35 29' - 6" Open
5th Electric 30' - 0" Electric Electric winch
36 30' - 9" Open
37 31' - 6" Blackout Drop Removable
38 32' - 3" Tab Legs Removable
39 32' - 6" Black Scrim Removable
40 33' - 3" White Scrim Removable
41 33' - 9" Muslin Cyc Removable
42 34' - 0" Open
43 34' - 6" Open - Softgood Storage "Very" close to back wall

All distances are taken from plaster line.
Apron truss and pipe are downstage of the plaster line.

* Line #4 overhangs the Stevens Center Movie Screen. The screen is just down stage of line #4 and is suspended from 1 foot box truss. This line set can be used but do consult with the house Production Manager or Technical Directors before incorporating line #4 in your plans.


previous - next

Table of Contents